CHATSWOOD RAIL, SYDNEY AUSTRALIA
4 Ken have designed a number of large span Overhead Protection Systems. These systems incorporate a series of prefabricated modules fabricated from 610 UB’s fully cross braced and fitted with scaffold deck flooring.
This ensures that the modules can be lifted in a safe and stable manner and the works on site are minimised. This provides minimal disruption to the public (and structures below) and quickly creates a usable platform with a load capacity up to 10kPa as required by Workcover and the City of Sydney.
See image gallery below showing the use of these modules over Chatswood Train Station, to ensure a safe walkway and passage for commuters to and from the station.
|